PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Copper piping at the 2nd floor Facing West.jpg Exterior framing at the 1st floor Facing South.jpg Installed insulation at the 1st floor bathroom carriers Facing West.jpg Installed motorized damper controllers at the 1st floor Facing North.jpg Installing bathrom carriers at the 4th floor Facing East.jpg Installing curtain wall returns at the South Elevation 1.jpg Installing curtain wall returns at the South Elevation 2.jpg Installing motorized damper controllers at the 2nd floor Facing South.jpg Installing sprinkler main raiser at Stair -2 4th Floor Facing East.jpg
Previous pageNext page Installing bathrom carriers at the 4th floor Facing East
Installing bathrom carriers at the 4th floor Facing East